The Lord blessed us last week with a wonderful time of Christian fellowship and productivity when nearly 100 volunteers converged on Lakeshore to push forward with the new church building construction. We hung siding on the south side of the building, installed the air conditioning units and ran the duct work, dug the elevator pit, pour steps for the front entrance, set the large columns for the front portico, and several other things.
The team consisted of a network of Reformed Baptist Churches who have been to Lakeshore every January for the last nine years. I truly have been blessed by the relationships forged through this partnership.
To read a detailed account of the happenings throughout the week, check out their blog “The Lakeshore Project“